Progress has been good over the last few weeks we have made the last of the overhead lockers which is to go over the front sliding door ,This was again made from plywood and will have a speaker to match the other side ,the seat base next to the door has been fitted for the last time so now the bed can be made using all the cushions .behind this we have put a wardrobe ,I need to shorten the door as the door from the caravan is too big.
We have also made good progress in the bathroom the shower tray has been fitted along with the wooden frame to take the plastic covers from the old caravan ,the toilet has had a base made for it so it dose not roll up and down when driving. we are going to fit a small sink in the corner so the water and waste pipes need to be run as of yet. I still need to seal the edge of the tray this will be done later .